Puyang Drainage Board Manufacturer 156-2152-1000Manager Shao, Tai'an Daxing Geosynthetic Materials Co., Ltd., main products: drainage boards, plastic drainage boards.Grass paving grids, water retention boards and other construction materials.KKolps33378
Architectural Features:156-2152-1000 Manager Shao
1、 Environmentally friendly, non-toxic, pollution-free, impact-resistant, aging-resistant, and UV-resistant
2、 Wear-resistant, corrosion-resistant, with good flame retardancy and strong grass planting functionality
3、 Reduces ground reflection and thermal radiation
4、 Reduces sound wave transmission and lowers noise pollution
5、 Reduces dust and purifies airKKolps33378
6、 Rainwater naturally infiltrates, soil does not wash away, and there is no water accumulation
7、 Water, air, and nutrients circulate naturally, preventing soil compaction
8、 Increases green area · Simple construction, lightweight
9、 Can be freely combined and disassembled, reusable
10、 Good load-bearing effect: can bear over 200T/㎡ weight
Puyang Drainage Board ManufacturerProduct Introduction:156-2152-1000 Manager Shao
The grass paving grid is made of modified high molecular weightHDPE as raw material, environmentally friendly and fully recyclable; it integrates lawn and parking lot, with pressure resistance, wear resistance, impact resistance, aging resistance, and corrosion resistance, improving quality and saving costs; the unique flat plug-in design saves labor and is quick to install, allowing for adjustable expansion joints. After the grass paving grid is laid, a small roller or plate vibrator should be used to compact the surface, and any uneven areas need to be leveled until the surface is horizontal.
The dimensions of the grass paving grid are designed based on the dimensions of parking spaces, and generally do not require cutting during installation; when parking spaces have special shape requirements or there are sewage well covers on the parking spaces, the grass paving grid can be cut to fit different shapes of the parking spaces.156-2152-1000 Manager Shao
Construction Precautions:Puyang Drainage Board ManufacturerKKolps33378
1. The crushed stone foundation must be compacted, considering the large load-bearing pressure, the surface should be flat, with an optimal drainage slope of 1%—2%. The concrete foundation's drainage holes must be filled with pebbles or crushed stones and sand to prevent soil loss.
2. Each grass paving grid has interlocking sections, and should be interlocked during installation. After laying the grass paving grid, a small roller or plate vibrator must be used to compact the surface, and any uneven areas need to be leveled until the surface is horizontal.Puyang Drainage Board Manufacturer156-2152-1000 Manager Shao
3. It is recommended to use nutrient-rich soil to fill the grass paving grid. When backfilling, water should be sprinkled to allow the soil to settle. A bamboo broom should be used to evenly sweep the nutrient soil into the holes of the grass paving grid, with the soil height below the surface of the grass paving grid5-10mm as the standard.156-2152-1000 Manager Shao
4. Grass is generally Manilla grass, which is durable and easy to grow. When laying the grass, leave a gap of about 20mm, and stagger the installation in a herringbone pattern. After the grass is laid, water it thoroughly to soften it, and then use a small roller or plate vibrator to compact the grass roots into the grass paving grid (repeatedly), allowing the roots to grow downwards more easily.
5. Do not park for one month after laying; if the grass is laid between November and the following March (dormant period), it should be maintained for two monthsPuyang Drainage Board Manufacturer before parking.156-2152-1000 Manager Shao
6. During use or after the rainy season, if a small amount of planting soil is lost, some soil or sand can be evenly sprinkled from the lawn surface to fill in the soil washed away by rainwater.KKolps33378
7. The lawn needs to be trimmed 4-6 times a year, with timely weeding and fertilizing. In hot and dry seasons, regular watering or installation of automatic sprinkler systems is necessary to ensure proper maintenance management.156-2152-1000 Manager Shao
Drainage boards, water retention boards, grass paving grids and other series of geosynthetic materials please contact Manager Shao 156-2152-1000
Welcome to call for consultation15621521000
Contact person: Manager Shao Phone: 156-2152-1000
Address: Tai'an Agricultural University Science and Technology Industrial Park