Nanning Drainage Board Manufacturer 156-2152-1000 Taian Daxing Geosynthetic Materials Co., Ltd. Since its establishment, the company has been committed to the research, production, and application of products related to national transportation, water conservancy, landscaping, and municipal large-scale projects. Among them, geotextiles, geomembranes, geogrids, and other engineering materials have passed quality inspections by relevant departments in water conservancy, transportation, and electric power, fully complying with national quality standards. The company's products have been widely used in highways, railways, water conservancy, electricity, environmental greening, and infrastructure, as well as in several key national projects, receiving unanimous praise from experts and users in the engineering field.156-2152-1000 Manager ShaoKKolps33378
Our quality is reliable, and our prices are fair. All products have undergone quality inspections by professional institutions and come with product qualification certificates and inspection reports. Our company supports home delivery and has close ties with several established logistics companies, ensuring fast shipping, prompt arrival, and good product protection, all for the benefit of our customers. We look forward to cooperating with you. It is said that air-source heat pump technology can become the next important "lever" in the field of building energy conservation.KKolps33378
Our quality is reliable, and our prices are fair. All products have undergone quality inspections by professional institutions and come with product qualification certificates and inspection reports. Our company supports home delivery and has close ties with several established logistics companies, ensuring fast shipping, prompt arrival, and good product protection, all for the benefit of our customers. We look forward to cooperating with you. It is said that air-source heat pump technology can become the next significant "lever" in the field of building energy conservation.Nanning Drainage Board Manufacturer.156-2152-1000 Manager Shao
This type of board has both water storage and drainage functions. The board features extremely high spatial rigidity and has significantly better compressive strength compared to similar products (which can be verified through on-site testing). It can withstand a high compressive load of over 400Kpa, and can also endure the loads from mechanical compaction during the backfilling process of the planting cap.2. Strong load-bearing capacity and durability. Research from abroad shows that vegetation on rooftops can intercept and utilize a portion of water resources during the rainy season and effectively relieve the pressure on urban sewage pipelines. Therefore, in Germany, the government offers reductions in urban sewage fees for building owners who carry out rooftop greening. In Japan, the issue of how to introduce modern irrigation methods into rooftop greening has been prioritized as a key technical challenge. The automatic irrigation technology developed and introduced in recent years in our country can also effectively save irrigation water.
Nanning Drainage Board ManufacturerConstruction PreparationContact Number: 156-2152-1000 Manager Shao
1.Main Materials and Equipment
(1)Plastic drainage board (product specifications are selected based on design requirements and construction technical conditions).
(2)Main construction equipment for installing drainage boards (including guide frames, casing, vibration hammer for driving casing, hoist, and reel for installing drainage boards, as well as windproof devices, etc.). The IJB-16 type insertion machine can also be used, or a crane pile driver can be modified for easier insertion.
2.Operating Conditions (1) In the technical preparation before construction, according to the foundation design requirements and terrain geological conditions, determine the planar layout of drainage holes and the sequence for inserting drainage boards.156-2152-1000 Manager Shao
(2) The construction site and roads must meet the requirements for inserting drainage boards, such as the entry and exit of construction personnel and equipment, and the arrangement of temporary facilities (including water, electricity, communication, etc.).
(3) After marking the positions for drainage holes according to the site drainage hole locations determined by the construction organization design, use bamboo sticks to mark the insertion points.
(4) Conditions for filling soil must be met.
PrecautionsNanning Drainage Board Manufacturer:Contact Number: 156-2152-1000 Manager Shao
1.Pay attention to the technical performance of the drainage boards. Each batch of products entering the site must be randomly inspected and passed as qualified before construction can proceed. 2.Before construction, refer to geological data and carry out necessary probing (test holes) checks within the site range for laying drainage holes to avoid hitting underground obstacles during the insertion of drainage holes as much as possible. (The probing depth should not exceed the design depth of 60CM).3.If underground obstacles are encountered that prevent further insertion or cause the hole to tilt (beyond the allowable deviation), the hole should be abandoned, and the pipe should be repositioned (approximately 45CM away) to reinsert the drainage hole. 4.The process of inserting drainage holes should use a constant load vibration pressing method, continuing until the required design depth is reached; heavy hammer striking is not allowed.
Drainage boards, water storage boards, grass-planting gridsand other series of geosynthetic materialsplease contact Manager Shao 156-2152-1000
Contact Person: Manager Shao Phone: 156-2152-1000
Address: Taian Agricultural University Science and Technology Industrial Park
Welcome to call for consultation15621521000