Jiaozuo Drainage Board Manufacturer Contact Number: 156-2152-1000Taian Daxing Geosynthetic Materials Co., Ltd. Since its establishment, the company has been committed to the research, production, and application of products related to national transportation, water conservancy, landscaping, and large municipal engineering projects. Among them, geotextiles, geomembranes, geogrids, and other engineering materials have passed quality inspections by relevant departments in water conservancy, transportation, and electric power, fully complying with national quality standards. The company's products have been widely used in highways, railways, water conservancy, electric power, environmental greening, and infrastructure construction, as well as in multiple national key projects, receiving unanimous praise from experts in the engineering field and a wide range of users.156-2152-1000 Manager Shao
Our quality is reliable, and our prices are fair. All products have undergone quality inspections by professional institutions and come with product qualification certificates and inspection reports. Our company supports door-to-door delivery and has close ties with several established logistics companies, ensuring fast shipping, quick delivery, and good product protection. Everything is done with the customer in mind, and we look forward to cooperating with you. It is stated that air source heat pump technology can become the next important "focal point" in the field of building energy conservation. KKolps33378
Grass Grid Base Layer Treatment for Fire Truck Access Roads:Jiaozuo Drainage Board Manufacturer156-2152-1000 Manager Shao
1. The base soil under the grass grid on the fire truck access road should meet the design requirements for general concrete fire truck access roads.156-2152-1000 Manager Shao
2. The construction of the gravel cushion layer and the stone powder stabilization layer for the fire truck access road should also comply with the design requirements for ordinary concrete fire truck access roads.
3. A80mm thick planting soil layer should be placed on the stone powder stabilization layer. The soil layer should consist of:30% gravel with a particle size of10-30,15% medium-coarse river sand, and55% cultivated soil mixed with an appropriate amount of organic fertilizer. These three components should be mixed evenly and spread over the compacted stone powder stabilization layer, and then rolled and compacted to serve as the base layer for the grass grid.
4. Grass grids should be installed and planted on the grass grid base layer.156-2152-1000 Manager Shao
5. It is worth noting that if the fire truck access road is the main passage for regular vehicles, the frequent and fast-moving traffic can adversely affect the use of the grass grid and the normal growth of the turf, reducing the greening rate and aesthetics. In this case, we recommend using concrete pavement for major vehicle traffic roads. Grass grid pavement should only be used on roads where fire trucks may enter in emergencies. Similarly, it is suggested to use concrete pavement for the main access road in parking lots, while the parking spaces can utilize grass grid greening.Jiaozuo Drainage Board Manufacturer KKolps33378
Construction Precautions:156-2152-1000 Manager Shao
1. The gravel foundation must be compacted, taking into account the high bearing pressure. The surface should be flat, with a drainage slope of1%—2% being optimal. The drainage holes in the concrete foundation must be filled with cobblestones or gravel and sand to prevent soil loss.
2. Each grass grid has interlocking sections, and they should be installed by interlocking them. Once the grass grids are installed, use a small roller or plate vibrator to compact the surface of the grass grids back and forth. Any uneven areas should be adjusted until the surface of the grass grids is level.
3. It is recommended to use nutrient soil for filling the grass grids. When backfilling, water should be used to help the soil settle. A bamboo broom should be used to evenly sweep the nutrient soil from the surface of the grass grid into the holes, with the soil height kept 5-10mm below the plane of the grass gridJiaozuo Drainage Board Manufacturer as a reference.156-2152-1000 Manager Shao
4. Turf is generally made of Manila grass, which is durable and easy to grow. When laying turf, leave a gap of about20mm and install it in a staggered pattern. After laying the turf, soak it with water to soften it, and then use a small roller or plate vibrator to press the grass roots down into the grass grid (repeatedly), facilitating the downward growth of the grass roots.
5. After one month of maintenance, the area can be used for parking; if construction is done betweenNovember andMarch of the following year (dormant period), the grass should be maintained for two months beforeJiaozuo Drainage Board Manufacturer parking.156-2152-1000 Manager Shao
6. During use or after the rainy season, if there is a small amount of planting soil loss, some soil or sand can be evenly sprinkled from the surface of the lawn to fill in the soil lost due to rainwater erosion.Jiaozuo Drainage Board Manufacturer KKolps33378
7. The lawn requires 4-6 trims a year, timely weeding, fertilization, and during hot and dry seasons, regular watering or installation of automatic sprinkler systems is necessary to ensure proper maintenance management.
Drainage boards, water storage boards, grass grids and other series of geosynthetic materials contact Manager Shao 156-2152-1000
Welcome to call for consultation 15621521000
Contact Person: Manager Shao Phone: 156-2152-1000
Address: Taian Agricultural University Science and Technology Industrial Park