Huai'an Drainage Board Manufacturer 156-2152-1000Manager Shao, Taian Daxing Geosynthetic Materials Co., Ltd., main products: drainage boards, plastic drainage boards.Grass grid, water storage boards and other building materials.KKolps33378
Product Status of Drainage Boards:KKolps33378
1, the construction of urban drainage systems should be accelerated. Most cities in China do not have systematic drainage pipelines; some rely on streets and rivers for drainage, which affects environmental sanitation. Some have low drainage capacity, leading to prolonged water accumulation in some cities after rain, significantly impacting daily life and production.156-2152-1000 Manager Shao
2, we should quickly explore economical, efficient, energy-saving, technologically advanced new processes and technologies for urban sewage treatment that are suitable for China's national conditions.KKolps33378
Huai'an Drainage Board Manufacturer3, we should vigorously carry out research on sewage resource utilization.
4, we should strengthen research on new technologies for water quality testing, automated operation management, and standardization of water treatment equipment.
5, actively conduct research and promote new technologies for controlling industrial pollution, such as harmless wastewater processes, closed-loop systems, and comprehensive utilization.156-2152-1000 Manager Shao
6, research on regional drainage systems should be initiated, using the theories and methods of systems engineering and electronic computing technology to conduct comprehensive system analysis of various factors such as regional planning, effective utilization of water resources, and sewage treatment, starting from the entire river basin, establishing various simulation tests and mathematical models to seek optimal designs and management for water pollution control.
Huai'an Drainage Board ManufacturerPrecautions:156-2152-1000 Manager Shao
1, when inserting pipes, the deviation between the pipe boot and the board position marker should be controlled within ±70mm.
2, during the insertion process, attention should be paid to control the verticality of the casing, with a deviation not greater than ±1.5%.
3, the insertion height of the plastic drainage board must be strictly controlled according to design requirements; shallow deviations must not occur; if geological conditions change making it impossible to insert according to design requirements, contact the on-site supervision personnel promptly and obtain consent before changing the insertion height.
4, phenomena such as twisting, breaking, and tearing of the filter membrane are strictly prohibited during the insertion of plastic drainage boards.KKolps33378
5, the length of the return fold must not exceed500mm, and the number of return folds should not exceed5% of the total number of insertions.
6, when cutting the plastic drainage board, the exposed length above the sand cushion layer should be greater than0.5m.
7, the construction condition of each board should be checked, and only when it meets the acceptance standards can the machine move on to insert the next one; otherwise, it must be supplemented near the board position.Huai'an Drainage Board Manufacturer156-2152-1000 Manager Shao
8, self-checking should be performed for each board during the insertion process, and construction records should be made according to requirements for the original construction record of plastic drainage board.
9, the plastic drainage board inserted into the foundation should preferably be a whole board; if the length is insufficient and needs to be extended, it must be done according to prescribed methods and requirements.
10, after the acceptance of a segment of plastic drainage boards, the holes formed around the boards during insertion should be carefully filled with sand material from the sand cushion layer, and the plastic drainage boards should be buried within the sand cushion layer.
Huai'an Drainage Board ManufacturerInsertion Requirements for Drainage Boards :156-2152-1000 Manager Shao
(1)Ensure the continuity of the drainage board entering the soil; if a break is found, reinsertion is required.
(2)The overlap length connecting the upper and lower drainage boards should not be less than10CM, and it should be securely connected.
(3)The insertion of the drainage board must reach the designed soil depth before the pipe can be pulled out.
(4)After completing the insertion of the drainage board and cutting it off, the exposed length of the "board head" above the ground cannot be less than15CM。
Compared to conventional processes, the composite of the drainage board and geotextile integrates multiple functions such as drainage, waterproofing, breathability, moisture retention, and root isolation; it is used in thermal insulation flat roofs or the bottom plates of underground works. The multiple support points of the drainage board create a gap between the building surface layer and the structural layer, providing functions such as moisture isolation, drainage, and thermal insulation; the product edges have various sizes of support points that can interlock and overlap, allowing for quick drainage even with significant water leakage. Construction and transportation are very simple and convenient. KKolps33378
Applications of Plastic Drainage Boards: Soft foundation treatment projects in domestic and international highways, railways, airports, power plants, stacking yards, ports, land reclamation, sewage treatment plants, landfills, coastal reclamation, hydraulic and hydropower projects, and dock construction.
Company website:www.daxingtugong.com
Taian Daxing Geosynthetic Materials Co., Ltd. focuses on drainage boards as its leading product, offering cute prices and high-quality enjoyment.
Welcome to call for consultation 15621521000
Contact: Manager Shao Phone: 156-2152-1000 Address: Taian Agricultural University Science and Technology Industrial Park