Hangzhou Drainage Board Manufacturer 156-2152-1000Manager Shao, Taian Daxing Geosynthetic Materials Co., Ltd., main products: drainage boards, plastic drainage boards.Grass paving grids, water retention boards, and other construction materials.KKolps33378
Application of the Product:156-2152-1000 Manager Shao
Large grass paving grids are specially designed products for outdoor landscaping and urban ecology. Their unique design protects the roots of grass, allowing it to grow safely even under the pressure of people and vehicles. As the grass grows and covers the paving grid, it becomes visually and physically closer to its natural state.
This product is used to create green fire lanes, green fire platforms, green lawn parking lots, green pedestrian streets, etc., allowing vehicles to park directly on the lawn without damaging it. When the vehicles leave, it becomes a natural green lawn space that can be freely accessed, greatly increasing the greening area and creating a beautiful living space, a new trend in grass paving.
Drainage BoardConstruction Precautions: Hangzhou Drainage Board Manufacturer 156-2152-1000 Manager Shao
1. When used in gardens for flower beds, flower troughs, and flower borders, directly replace conventional materials (such as expanded clay, pebbles, or shells) with water retention boards and filter geotextiles.KKolps33378
2. When greening hard interfaces such as new and old roofs or underground engineering tops, clean the site of debris before laying the water retention and drainage boards, set up a waterproof layer according to the design drawings, and create a slope with cement mortar to ensure a smooth surface. The water retention and drainage boards should be arranged orderly, and there is no need to set up additional drainage blind ditches within the laying area.
3. When making building interlayer panels, the water retention and drainage boards are laid on the concrete roof slab, and a single wall is built outside the drainage board, or concrete is used for protection, so that underground seepage water flows into the blind ditch through the elevated space of the drainage board.
4. The water retention and drainage boards are interconnected around, and the gaps during laying serve as lower drainage channels. The geotextile filter moisture layer must be properly lapped when laid.156-2152-1000 Manager Shao
5. After the water retention and drainage boards are laid, the next process can proceed, and the filter geotextile and substrate layer should be laid as soon as possible, to prevent soil, cement, or yellow sand from blocking the channels or entering the water retention, water trough, and drainage channels of the drainage board. To ensure the water retention and drainage board functions properly, an operation board can be laid on top of the filter geotextile to facilitate greening construction.
Hangzhou Drainage Board Manufacturer Construction of the Protective Layer:156-2152-1000 Manager Shao
When using prefabricated concrete blocks as a protective layer, evenly spread about3-5cm of fine sand or plain soil (the fine sand or plain soil must not contain stones or other debris larger than 2cm). Then proceed with the construction of the concrete block protective layer, or directly build the concrete blocks on the waterproof mat using cement mortar, following the same construction methods and requirements as for the protective layer when using membrane materials for impermeability.
Function of the Product Laying: Hangzhou Drainage Board Manufacturer KKolps33378
①Landfill projects are suitable for wide, large rolls of waterproof mats, and mechanical construction is recommended during laying.
②Lay the waterproof mat in blocks and areas.156-2152-1000 Manager Shao
③For slopes with a larger gradient, plastic anchor nails can be used for fixation.
④During laying, the non-woven side of the waterproof mat should face down (i.e., towards the mat layer side), and the woven side
should face up (i.e., towards the side where the geotextile membrane will be laid)156-2152-1000 Manager Shao
⑤All laid waterproof mats must have the upper layerHDPE membrane constructed on the same day to ensure that rain, snow, or sun exposure does not cause the waterproof mat to lose its waterproof function, thus requiring a reasonable construction plan to be prepared in advance.
⑥If the landfill design only uses a single layer of waterproof mat (GCL) as the impermeable layer, the backfill construction must be completed and compacted on the same day after the waterproof mat is laid.
Drainage Boards, Water Retention Boards, Grass Paving Gridsand other series of Geosynthetic MaterialsIf needed, please contact Manager Shao 156-2152-1000
Taian Daxing Geosynthetic Materials Co., Ltd. focuses on drainage boards as the leading product, with reasonable prices and high-quality enjoyment.
Welcome to inquire by phone15621521000
Contact Person: Manager Shao
Phone: 156-2152-1000
Address: Taian Agricultural University Science and Technology Industrial Park